Create a shipment - Intergraph Smart Materials - Version 10.1 - Help - Hexagon

Intergraph Smart Materials Portal Classic Help (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Portal Classic
Search by Category
Help
Smart Materials/Smart Reference Data Version
10.1

Are the packages in a shipment always shipped together?

It depends on the means of conveyance (MOC) that you define for the shipment. If a shipment has Rail or Truck defined as MOC, then the packages can be shipped at different times in different trucks or wagons. For all other MOCs, the packages in a shipment must be shipped together.

  1. On the Freight Forwarding tab, select Shipments from the list at the top left of the page.

  2. Click Create Shipment create_ppl.

  3. Select the EML Number from the EML Number list.

  4. Select the packing lists that you want to include in the shipment.

    Only the approved packing lists with an assigned Release to Forwarder date are displayed. If ZP_LNK_MOC is set to 'Y', additionally a MOC Code has to be assigned to the packing list for it to be included in a shipment.

    SHARED Tip You can also expand a packing list and select specific packages to include in the shipment.

  5. Click Next.

  6. Type a shipment number in the Shipment Number box.

    Shipment number is generated automatically, if the project default, ZP_AUTOSHP is set to Y.

  7. Select the means of transport from the Means of Conveyance box.

  8. Enter the Departure Point and the ETD of the shipment.

  9. Enter the Arrival Point and the ETA of the shipment.

    Depending on the means of conveyance (MOC) selected, you might have to enter additional information in this page.

  10. Click Save and Continue.

See Also

Add a truck for a shipment

Add containers for a shipment

Add a wagon for a shipment

Create a pre-shipment

Create a post-shipment