Establish the Work Breakdown Structure (WBS) - Intergraph Smart Materials - Version 10.1 - Administration & Configuration - Hexagon

Intergraph Smart Materials Integration (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Construction Version
8
Smart Materials/Smart Reference Data Version
10.1

Establishing a work breakdown structure is a typical requirement for any project. If possible, the WBS in Smart Materials should duplicate exactly the WBS issued by the project. Aligning these structures enables easy synchronization of budgets, account codes, design areas, etc. The WBS can be changed after it is created, but changing the structure should be avoided.

A typical WBS for piping is:

Discipline > Unit > Area > Sub Area > Line ID

If the WBS does not exist prior to import, Smart Materials can create it if the necessary configuration is complete. The following is an overview of defining a WBS.