B 20.01 Edit BOM - Intergraph Smart Materials - Version 10.1 - Administration & Configuration - Hexagon

Intergraph Smart Materials Integration (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Construction Version
8
Smart Materials/Smart Reference Data Version
10.1
  1. In B 20.05 create a new MASTER node. Scroll past the last entry to highlight a new field and click Create New Node.

    IDD01

  2. Enter the master node details and click OK. Create the discipline as the master node. This enables the correct material to be easily identified if multiple disciplines are referenced.

    IDD02

  3. To create sub nodes, highlight the master node. Click Create New Node. Continue these steps until the structure is complete.

    IDD03

  4. Copy, move, and delete nodes from the current discipline as well as other disciplines, with or without the associated material.

  5. Create node attributes now or later (refer to the section on node attributes).

There is a generated name to the right of the node name, which comprises the short description of the node.