Define Import Job - Intergraph Smart Materials - Version 10.1 - Administration & Configuration - Hexagon

Intergraph Smart Materials Integration (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Construction Version
8
Smart Materials/Smart Reference Data Version
10.1

To define an import job, use the Smart Materials B.40.01 screen.

The following settings are specific to Smart Instrumentation:

  1. Choose the by Smart Instrumentation Online Access data source.

  2. Specify a BOM start node. This step is mandatory.

  3. Choose an Issue Status and a List Status. This step is mandatory.

  4. Click the Specific Settings button and enter the nodes that you want to include in this import run. You can select them with LOV or type them in manually. You can use the Oracle underscore and percent wildcard symbols.

  5. When you complete your list, click the Ok button to return to B.40.01.

  6. Select the Transfer check box.

    SHARED Tip You are not required to select any of the other check boxes on B.40.01.

  7. Now you can save your job definition and start the job.

For more information about job definition and execution with B.40.01, see Open MTO Interface.