SAP Requisition Data Mapping - Intergraph Smart Materials - Version 10.1 - Administration & Configuration - Hexagon

Intergraph Smart Materials Integration (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Construction Version
8
Smart Materials/Smart Reference Data Version
10.1

The data transfer to SAP takes place with the help of the IDOC data structures. The IDOC PREQCR01 is available for the requisition data transfer, and its fields will be filled with data according to their meanings. This takes place on the SAP 40.02 SAP Requisition Data screen.

The SAP 40.02 SAP Requisition Data section contains the screen description.

To transfer the Smart Materials requisition to SAP, a certain number of IDOC fields must be filled. All fields that must at least be mapped are listed in a table in the What data is transferred? section.

The described fields relate to an SAP standard installation, so a user can have additional mandatory fields. This depends on the SAP installation customization.

Mapping of data should only be done by people who have appropriate knowledge about IDOCs and SAP as wells as knowledge about Smart Materials standardization / BOM / REQ.