Post Processing - Intergraph Smart Materials - Version 10.1 - Administration & Configuration - Hexagon

Intergraph Smart Materials Integration (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Construction Version
8
Smart Materials/Smart Reference Data Version
10.1

The PDMS 10.04 Create Procedures and PDMS 10.05 Spec Type Procedure Relations screens allow for the definition of post processing procedures for the PDMS interface.

On the PDMS 10.04 Create Procedures screen, you can define and maintain procedures.

Enter the name of the procedure in the Procedure field. Then define the procedure in the Procedure Body field. Click the Check button to validate the syntax of the procedure. Validation is also done automatically for each record when scrolling through this block. The validation result is always displayed in the Check Result field. Click the Execute button to execute the selected procedure immediately. The Standard check box indicates a standard procedure delivered with the software.

On the PDMS 10.05 Spec-Type-Procedure Relations screen, you can link the procedures to the spec type and run them automatically after the Specon file is generated.

Select the spec type in the first (S.50.02 Specification Types) block. Then assign the procedures to the selected spec type in the second (Spec-Type-Procedures) block. Enter a sequence number in the Seq field; this number controls the order of the procedure execution. Select the procedure from the LOV in the Procedure field. The Project/PG field is filled automatically with the login project/product group.