Integrating Multiple Systems - Intergraph Smart Materials - Version 10.1 - Administration & Configuration - Hexagon

Intergraph Smart Materials Integration (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Construction Version
8
Smart Materials/Smart Reference Data Version
10.1

In continuation of the configuration concept of the first part of the SAP interface, this part of the interface can also be connected with several SAP systems.

You should communicate with only one SAP system within a Smart Materials project. However, it is possible to have all of the Smart Materials projects communicate with one or more SAP systems. This is on condition that each SAP system is fed only by one Smart Materials system.