This project default specifies whether only one OSD per MRR number is allowed.
The allowable values for this project default are Y and N; the default is N. When the project default is set to Y, the number of OSDs (Over, Short, or Damaged) that can be created for material receivings are restricted to one OSD for each MRR (material receiving report).
If you switch ZC_OSD_ONE from N to Y even though OSDs have already been created, and you cannot create further OSDs in the Receiving screens (C.20.01-.05), use the OSD screens (C.20.09.01-.05) instead.
-
Module(s) affected by this setting: Material Receiving, Classic: C2001, C200102, C2002, C2003, C2004, C2005
-
Default value: N
-
List of Values: N/Y