ZP_POP_ETA - Intergraph Smart Materials - Version 2020 (10.0) - Administration & Configuration - Hexagon PPM

Intergraph Smart Materials Classic Administration (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
2020 (10.0)

Indicator whether ETA date of a means of conveyance is to be taken over to Pred On Site in expediting; refers only to basic expediting.

Project default ZP_POP_ETA is used by basic traffic and affects the predicted on site date of item shipments in basic expediting.

If this project default is set to NO (default value), the ETA date of a means of conveyance is not taken over to the item shipments assigned to it.

If you set this project default to POP_ETA, the ETA date of a means of conveyance is populated to the predicted on site date of its associated item shipments.

If you set this project default to POP_MOC, several date values are copied to the associated item shipments:

- ETD Date pred ship date

- ATA Date actual ship date

- ETA Date pred traffic arrival date

- ATA Date actual traffic arrival date

Also, the predicted on site date is recalculated if in screen P.10.53 Routing Methods one destination is set to date type Traffic Arrival and another destination with a higher order sequence to type Arrival On Site. The new value then depends on the sum of transit days between these two destinations:

predicted on site date = ATA date + sum of transit days

If ATA date is not set, but ETA date is set this date value is used.

If both ETA date and ATA date are not set, the predicted on site date is calculated as:

predicted on site date = curr/rev prom ship + sum of all transit days of the routing method.

If curr/rev prom ship is not filled, prom ship date is used for calculating.

  • Module(s) affected by this setting: P7031, P7062, P7072, P80

  • Default value: NO

  • List of Values: NO, POP_ETA, POP_MOC