This project default specifies the default value for the IRC Required indicator when item shipments are created. To overwrite this default, you can use P.70.72 Expediting Details.
(If an IRC is required, you cannot assign a release note to an item shipment not assigned to an IRC.)
-
Module(s) affected by this setting: P7072
-
Default value: N
-
List of Values: N/Y