Maintain planning history (P.60.03).
Controls protocoling behavior with respect to changes applied to requisitions planning. If set to N (which is the default), protocoling is disabled, and tab Planning History in screen P.60.03 Requisitions Planning is invisible.
By setting this project default to Y, the Planning History tab will become available, and protocoling of changes to requisitions planning will be enabled.
-
Module(s) affected by this setting: P6003
-
Default value: N
-
List of Values: N/Y