ZP_SITELOC - Intergraph Smart Materials - Version 2020 (10.0) - Administration & Configuration - Hexagon PPM

Intergraph Smart Materials Classic Administration (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
2020 (10.0)

Location of the construction site.

This project default is used for displaying the shipping days in screens P.30.22 Commercial Evaluation and P.30.27 Bidder Quotation.

Depending on the incoterm, the delivery place of a quote detail may be a long way off from the actual construction site, nearby or even the site itself. To be able to evaluate whether material will arrive on site on time, the number of days required for shipping it from the delivery place to the site is needed. These shipping days are maintained in screen P.10.38 Shipping Days.

  • Module(s) affected by this setting: P3022, P3027

  • Default value: ./.

  • List of Values: P1037 Delivery Places