This tutorial covers the process of issuing material at construction sites. Using piping as a core discipline, examples are presented for issuing material based on reservation.
In addition, this section describes the subject of over-issue (to subcontractors) and the management of issued material reported missing, lost, or damaged.
Material can be issued from a site warehouse using different methods in Smart Materials. These methods are listed below.
-
Direct issue
-
Issue by reservation
-
Issue by BOM commodity
-
Issue by BOM ident
-
Plate issue