Purpose
This section explains how to define requisition split sets needed for the MTO type definition. For this exercise, we define a NO_SPLIT set for material that should not be split.
Exercise
-
Open the R.10.42 Req Split Criteria screen from the Smart Materials > E&PI (Req) > R.10 Setup menu branch. The screen opens in input mode; all fields are empty and the mandatory fields are displayed with a green background.
-
Enter ‘NO_SPLIT’ as the name of the requisition split set in the Set Name field and ‘No Split’ in the Short Desc and Description fields.
-
Click the Save button to save the new split set.
-
Click in the Detail Code field of the second (Req Set Details) block, and enter ‘NO’ in the Detail Code field and ‘1’ in the Exe Seq field.
-
Click in the Where Condition field, and open the LOV using the List of Values button, select NO_SPLIT from the list, and click OK to complete the selection.
-
Click the Save button to save the changes.
-
Close the screen by selecting File > Close All or Close from the main menu.