When you check in a pipeline to the Isogen database, the software automatically saves any changes that you have made. However, you can use the Undo Check Out command to check in a pipeline without saving any changes.
-
Click Project > Undo Check Out.
The Isogen Database View window opens and displays the pipelines with a Checked Out status.
-
Select a pipeline. Use the CTRL and SHIFT keys to select multiple pipelines.
-
Click Undo Check Out .
The software checks in the pipeline and removes the file from the Work folder.
-
If the file is currently open, the software displays a message in the Status bar prompting you to save and close the file.
-
When you "undo the check out", Checkout Status reverts to Checked In and Isometric Status reverts to Pending. However, the major and minor versions of the pipeline remain unchanged.