Introduction to Projects - Intergraph Smart P&ID - Administration & Configuration - Intergraph

Intergraph Engineering and Schematics Projects Configuration and Reference (2019)

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
Smart Electrical Version
2019 (9.0)
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)

Plants, once designed and built, are often modified throughout their lifecycles. During these modifications, information assets of the "As-Built" state must be maintained. Using projects in your plant allows you to maintain this information while allowing multiple projects, possibly overlapping and running concurrently, to be designed, approved, constructed, and/or canceled. This guide explains how to implement projects in Intergraph Smart® P&ID and Intergraph Smart® Electrical.

Project configuration (enable, create, set scope, delete, and disable) is done in Intergraph Smart® Engineering Manager. For details, see Configuring Projects.

Customer Support
Hexagon PPM Policy Against Software Piracy
Copyright © 1999-2019 Hexagon AB and/or its subsidiaries and affiliates
Version 2019 (9.0)
Published 5/29/2022 at 7:38 AM