Verifying Drawings for Checkin Dialog Box - Intergraph Smart P&ID - Administration & Configuration - Intergraph

Intergraph Engineering and Schematics Projects Configuration and Reference (2019)

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
Smart Electrical Version
2019 (9.0)
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)

Displays the progress of the version verification operation currently underway. This dialog box opens when you click Project > Verify for Checkin.

PPM All Outputs Graphic

Drawings — Lists the drawings that are being verified for checkin, and shows the status of that operation.

View Log — Opens the log file that is created by the verification process.