Change the Status of All Completed Items to Claimed - Intergraph Smart P&ID - Administration & Configuration - Intergraph

Intergraph Engineering and Schematics Projects Configuration and Reference (2019)

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
Smart Electrical Version
2019 (9.0)
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)

This feature allows you to revert the Completed status of all the project items to Claimed. This is especially helpful when you want to use an existing plant as a source for similar plants by using the Load plant as project feature in Smart Engineering Manager. You can load this plant as a project into different plants, edit this project, and then merge it into your As-Built plant.

  1. Open the project for which you want to change the item statuses.

  2. On the Project Management toolbar, click PPM All Outputs Graphic to open the Project Status dialog box.

  3. Click the Claim All Completed Items button.

  4. When prompted to confirm the action, click Yes.

  5. On the Project Status dialog box, click Close.

Note that this command is available only for active projects. If your project is not active, prior to changing the item statuses, you need to click Reactivate on the Project Status dialog box.