Release Claim Command - Intergraph Smart P&ID - Administration & Configuration - Intergraph

Intergraph Engineering and Schematics Projects Configuration and Reference (2019)

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
Smart Electrical Version
2019 (9.0)
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)

Displays the Release Claim dialog box and allows you to relinquish control (by your project) of the selected items.  This dialog box also displays when you attempt to unclaim an item that has been modified in the project. Claims must be released before projects can be completed or for other projects to be able to check in drawings with changes.

  • In Smart P&ID only, you can use the Compare and Refresh command to revert the item back to the As-Built state prior to unclaiming.

  • If you are working in a SmartPlant environment and there are any differences between an item in the Project and an item in the As-Built, the claim cannot be released. If you are not working in the SmartPlant environment, the claim can be released. Also, items that display no warnings or errors are released.

  • This command can only be used for items that belong to the active drawing.