Fetch a Deleted Drawing - Intergraph Smart P&ID - Administration & Configuration - Intergraph

Intergraph Engineering and Schematics Projects Configuration and Reference (2019)

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
Smart Electrical Version
2019 (9.0)
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)

Before performing this scenario, ensure that you have completed all the prerequisite activities described in Sample Project Workflows.

  1. In Drawing Manager, select Project 1 and check out Drawing C from the Plant.

  2. Open Drawing C and do the following:

    1. Claim Flow Indicator FI-100.

    2. Change the Tag Sequence Number of the Flow Indicator from 100 to 101.

    3. Exit Drawing C.

      Drawing C becomes Drawing C'.

  3. In Project 2, fetch Drawing C from the Plant.

  4. Open Drawing C and do the following:

    1. Claim Flow Indicator FI-100.

    2. Change the Tag Sequence Number of the Flow Indicator from 100 to 202.

    3. Exit Drawing C.

      Drawing C becomes Drawing C''.

  5. In Project 1, delete Drawing C'.

  6. In Project 2, check out Drawing C from the Plant without replacing the existing P&ID.

  7. In Project 3, fetch Drawing C'' from Project 2.

  8. Open Drawing C'' and do the following:

    1. Add a Generic Tray to the vessel.

    2. Exit Drawing C''.

      Drawing C'' becomes Drawing C'''.

  9. In Project 2, undo the check-out of Drawing C''.

  10. In Project 3, check out Drawing C from the Plant, ensuring that the existing P&ID is not replaced.

    Drawing C becomes Drawing C''' in Project 3.

  11. Open Drawing C''' and do the following:

    1. Claim Flow Indicator FI-202.

    2. Exit Drawing C'''.

      Drawing C''' becomes Drawing C'''' in Project 3.

  12. Check in Drawing C''''.

  13. In Project 1, click Revisions > Fetch Deleted Drawing and select deleted Drawing C'.

  14. Check out Drawing C'''' from the Plant, ensuring that the existing P&ID is not replaced.

    Drawing C'''' becomes Drawing C' in Project 1.

  15. Attempt to check in Drawing C'.

    Unclaimed changes prevent check-in.

  16. Open Drawing C' and do the following:

    1. Claim the vessel.

    2. Claim Flow Indicator FI-101.

    3. Perform Compare and Refresh for the generic vessel tray.

    4. Exit Drawing C'.

  17. Check in Drawing C'.

PPM All Outputs Graphic

Key



Check out drawing

Fetch drawing

Continuity between procedure steps (an arrow indicates changes to the drawing or to drawing item data)

Check in drawing

Check-in unsuccessful

Undo drawing check-out

Delete drawing