This project default determines if the forecasted means of transport of the packages and the final means of conveyances (MOC) for a shipment need to be linked in the application.
If ZP_LNK_MOC is set to Y, then a link is established between the forecasted means of transport and the final means of conveyance for a shipment. This means that only a specific means of conveyance can be assigned to a shipment depending on the forecasted means of transport of the packing lists and packages in that shipment.
If ZP_LNK_MOC is set to N (default), then a link is not established between the forecasted means of transport and the final means of conveyance for a shipment. This means any means of conveyances can be assigned to a shipment irrespective on the forecasted means of transport of the packing lists and packages.
-
Module(s) affected by this setting: Traffic, Smart Materials Portal (Freight Forwarding)
-
Default value: N
-
List of values: N/Y