ZP_PPL_DEL - Intergraph Smart Materials - Version 10.2 - Installation & Upgrade - Hexagon

Intergraph Smart Materials Installation (10.2)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Installation & Upgrade
Smart Materials/Smart Reference Data Version
10.2

This project default controls whether the cleanup procedure (deleting obsolete PPLs) is executed automatically upon the approval of a release note.

For the traffic module, it is important that the item shipments should not be assigned to preliminary packages and approved release notes at the same time. To avoid this, a procedure can be launched which checks for item shipments on approved release notes that are also still assigned to the preliminary packages. Such item shipments are then removed from the preliminary packages which are deleted themselves if they do not contain other item shipments any longer. Finally, if a preliminary packing list loses all its packages during this procedure, it will be deleted, too.

  • Module(s) affected by this setting: Expediting > Inspection and Shipping Releases > Release Notes.

  • Available values: Y and N (default).

    • If set to Y, the cleanup procedure is executed automatically upon the approval of the release note. 

    • If set to N, the cleanup procedure is not executed automatically upon the approval of the release note, but a button is enabled on the Packages page that allows the user to launch this procedure manually.