Phase One: Prepare the Disconnected As-Built Project for an External EPC - Intergraph Smart 3D - Administration & Configuration - Hexagon

Intergraph Smart 3D Integration - Project As-Built with HxGN SDx

Language
English
Product
Intergraph Smart 3D
Subproduct
Project As-Built with SDx
Search by Category
Administration & Configuration
Smart 3D Version
13.1

Setting up a disconnected As-Built project for an external EPC begins with the O/O establishing a Change Management (CM) framework between Smart 3D and SDx. As with any As-Built project, connected or disconnected, the initial steps require the O/O to create an empty Change Management model and then register that model with SDx. Doing so enables the O/O to connect to the integrated environment to perform the required As-Built tasks of creating a work area definition and synchronizing it from SDx and then creating change actions for the necessary design work and allocating those change actions to the Change Management model. The final task in this phase of the process is for the O/O to create a backup of the Change Management model, and then send the dataset to the external EPC tasked with making the design changes.

The following diagram presents a high-level overview of the recommended work process for the O/O during Phase One of a disconnected As-Built project.

What do you want to do?