After you schedule a report package, you may need to modify that schedule. For more information about the individual report package schedule settings, see Scheduling a Report Package.
To modify a report schedule:
-
Click Reports > Schedule Reports in the left navigation bar.
-
In Asset, select the asset for the report package schedule you want to modify.
-
In the Schedule Name column, click the name of the schedule you want to modify.
-
If you want to rename the report schedule, complete the following steps:
-
Click Save Copy.
-
In Schedule Name, type a name for the schedule, and then click OK.
-
-
Change the email, schedule, and criteria settings as needed.
-
Click Save.