Memory Management Considerations - Intergraph Smart Engineering Manager - 2019 (10.0) - Installation & Upgrade - Hexagon

Intergraph Smart Engineering Manager Installation and Upgrade

Language
English
Product
Intergraph Smart Engineering Manager
Search by Category
Installation & Upgrade
Smart Electrical Version
2019 (9.0)
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)

Upgrading database information requires significant changes and, therefore, a significant amount of database server resources. For this reason, we recommend the following:

  • Upgrade only one plant at a time on a database server.

  • As much as possible, limit other activity on the database server during the upgrade process. You should limit the use of Hexagon PPM products on the server, as well as access to the database by other plants.

  • The more database server resources available for upgrade, the faster the upgrade process will proceed. The more activity occurring on the database server during the upgrade process, the longer that process will take.