Using Constraint Utilities - Intergraph Smart Engineering Manager - 2019 (10.0) - Installation & Upgrade - Hexagon

Intergraph Smart Engineering Manager Installation and Upgrade

Language
English
Product
Intergraph Smart Engineering Manager
Search by Category
Installation & Upgrade
Smart Electrical Version
2019 (9.0)
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)

Before running any of the constraint utilities recommended by the database constraint report, run the Clean Data utility inside a blank drawing, then run the Database Constraint Report.exe again. Running Clean Data first decreases the number of exceptions listed in the report and lessens the amount of further manual data cleanup required. For more information about running the Clean Data utility, see Clean Data Utility (DelOrpModItems.dll) in the Smart P&ID Utilities Guide.

The remaining constraint utilities must be run from within specific drawings. These utilities are located in the ..\SmartPlant\P&ID Workstation\bin folder, along with the Clean Data (DelOrpModItems.dll) utility.

Each plant may require a different set of utilities. Open each drawing listed in the Database Constraint Report and run the recommended macros on the drawing. You need to run only the macros listed in the report for that particular drawing.