This dialog opens during the Execute Split Command and specifies which splits to make to the selected system.
If the system that you selected has a higher continuity number than the interfering system, then the selected system is automatically placed in the Split Entity column, the interfering system is placed in the Splitter Entity column, and the Execute check box is automatically selected.
If the system that you selected has a lower continuity number than the interfering system, then the selected system is automatically placed in the Splitter Entity column, the interfering system is placed in the Split Entity column, and the Execute check box is not selected.
If the system that you selected and the interfering system have the same continuity number, then the interference is ambiguous. The software places the selected system in the Split Entity column, the interfering system in the Splitter Entity column, and then displays the names of both systems in red. You need to review ambiguous entries and can use the Invert option to select the needed result.
Execute
Select which split/splitter combination to process.
Split Entity
Displays the system intersecting the higher continuity setting. If you select the Split Entity column, the split system highlights in red in the graphic view.
Splitter Entity
Displays the system intersecting the lower continuity setting. If you select the Splitter Entity column, the splitter system highlights in yellow in the graphic view.
Select All
Selects all sets of split and splitter entities.
Select None
Clears the selection of sets of split and splitter entities.
Invert
Swaps the split and splitter entities for the active row.
Reject
Removes the selected sets of split and splitter entities and refreshes the Split List.
Accept
Brings a split entity that you have selected in the graphic view to the Split List and refreshes the Split List.
Finish
Creates the splits using the parameters that you have defined and then updates the Split List to display only entities that have not been split.