Rules of progress generation behavior - Intergraph Smart Construction - 2019 (7.0) - Help - Hexagon PPM

Intergraph Smart Construction Help (2019)

Language
English
Product
Intergraph Smart Construction
Search by Category
Help
Smart Construction Version
2019(7.0)
SmartPlant Foundation / SDx Version
10

Update an existing work step

Add a new work step

Remove a work step

Work step that is not associated with an IWP

The work steps and material items are updated.

The new work step is added to the system, but it is not associated to any IWP. If needed, the material is also added.

The work step and material item are removed from the system.

Work step that is in an IWP, but does not have any progress reported

The work steps and material items are updated.

The new work step is added to the system, but it is not associated to any IWP. If needed, the material is also added.

The work step is converted to a manually added work step, and the material item is converted to a manually added material item.

Work step that is in an IWP and has progress reported

The work step is not updated.

The work step and material item are not updated.

The work step and material item are not updated.

Manually added work step

Smart Construction determines if the manually added step was once a configured work step. If it was, the work step is converted to a configured step and updated. If not, the work step is not updated. If needed, the material item is added or transferred.

The work step and material item are not updated.

The work step and material item are not updated.

  • Users can refresh work steps in an IWP by clicking the Refresh Work Steps button on the Components window. Users can then select to add new work steps or only refresh work step data.

  • When users remove progress from a work step, Smart Construction refreshes work step data on outdated work steps. Smart Construction checks the component work type to determine if the work steps are outdated. If the work type was previously skipped when rules of progress was generated, the work type is refreshed.