Materials Management - Top Level Overview - Level 1 - Intergraph Smart Materials - Version 2.0 - Reference - Hexagon

Intergraph Smart Materials Enterprise Work Process for Materials Management

Language
English
Product
Intergraph Smart Materials
Search by Category
Reference
Smart Materials/Smart Reference Data Version
2020 (10.0)
  1. As a member of the engineering project team, I need to define the basis for design, by creating catalog data (components and specifications) so that the right material is defined for the project.

    See the work process Define Basis for Design - Level 1 Diagram for more information.

  2. As a planning engineer, I need to define requisition and procurement planning so that my material requirement and supply chain events are in-line with my project master plan.

  3. As the engineering project team, I need to design the project, including the schematics and 3D design work.

  4. As a member of the engineering project team, I need to generate the engineering materials requirements in the form of reports, including defining the BOM and the materials requirements.

    See the work process Generate Engineering Requirements - Level 1 Diagram for more information.

  5. As a buyer, I need to purchase materials.

    See the work process Purchase Materials - Level 1 Diagram for more information.

  6. As a project engineer, I need to create and develop subcontracts for services.

    See the work process Develop Subcontracts - Level 1 Diagram for more information.

  7. As an expediter/inspector/logistics controller, I need to control, move, and track the materials so that I can ensure materials will arrive on-site on time.

    See the work process Control Materials - Level 1 Diagram for more information.

  8. As a subcontracting administrator, I need to execute the subcontracts, so that I can ensure timely and correct execution of the subcontracts.

    See the work process Execute Subcontracts - Level 1 Diagram for more information.

  9. As a warehouse manager, I need to manage the inventory.

  10. As a construction planner, I need to simulate the materials availability to optimize construction work.

  11. As a warehouse manager, I need to issue the material for construction.

    See the work process Control Site - Level 1 Diagram for more information.

  12. As a planning engineer, I need to manage and report on the progress and status of the materials and services.