Specifies the relative cost of a bend relative to straight pipe. This value is used when CAESAR II is asked to select the most economic loop design. For example, if a bend (including hardware, fabrication, and other costs) costs 100 times as much as the same length of straight pipe, then the appropriate value would be 100.0.