Job Dependencies - EcoSys - 1.1 - Help - Hexagon PPM

Integrating EcoSys with P6 Connector

Language
English
Product
EcoSys
Search by Category
Help
EcoSys Version
1.1

Currently, the EcoSys Connect Scheduler does not handle dependencies between jobs. For example, ensuring that the WBS import runs before the Forecast import.

To handle dependencies, it is recommended to use EcoSys to combine Connect Job Actions into a single Action Batch and then schedule the Action Batch through Connect. For more information on how to configure Connect Job Actions, see EcoSys Connect Job Actions.

The P6 Connector comes with one Action Batch that is preconfigured to run all default jobs, called "ITG P6 Connector All Integrations". The jobs in this Action Batch will run according to the specified sequence number for each Action. The relevant jobs must be enabled or disabled depending on the requirements for a given EcoSys implementation.

This Action Batch is published as an API, called "P6RunAllIntegrations", so that it can be called directly from EcoSys Connect.

The typical use case for such an Action Batch would be a nightly scheduled execution, but it can also be run manually from within EcoSys.