An activity can be assigned to a requisition line item. When you assign an activity, the ROS (Required On Site) date of the line item is set automatically to the date of this particular activity.

Activities can be re-imported. Thus, the date of the activity can be changed. The ROS date, however, remains the same.

On the J.30.03 Activity Impact screen, you can see the impact of such a change of activity date on existing requisitions.

In the first (Engineering Requisitions) block, you can see all engineering requisitions that have at least one line item to which an activity has been assigned and the ROS date of which differs from the current date of that activity.

The requisitions are displayed with the name/number in the Engineering Requisition field, the supplement number in the Suppl field, the origin in the Origin field, and the description in the Description field.

The Approved by field displays the name of the user who approved this engineering requisition. The date when the requisition was approved is displayed in the Approved Date field.

In the second (Requisition Line Items) block, all line items of the selected requisition are displayed to which an activity has been assigned and the ROS date of which differs from the current date of that activity.

The line items are displayed with the position number in the Pos field and the sub position number in the Sub field.

The Ident Code field shows the ident code of the ident placed on this line item. The sizes of the ident are shown in the Size 1 to Size 4 fields.

The ROS Date field displays the required on site (ROS) date of the requisition line item.

The Activity Code field shows the name of the activity assigned to the line item.

The current date of the assigned activity is displayed in the Current Date field.

The Ident Short Description field at the bottom displays the ident short description.

Select the Sel check box of all line items you want to modify. Or click the Select All button to select all the displayed line items. Click Unselect All to cancel the current selection.

If you click the Update button, the ROS date of all selected requisition line items is set to the current date of the activity that is assigned to the line item.

If you click the Remove button, the assignment of an activity to the requisition line item is removed for all selected line items.

Click the Go to next block button to open window 2.

On this window, the agreements are displayed on which requisition line items with an assigned activity are placed and the ROS date of which differs from the current date of the activity.

The agreement line items are displayed with the agreement number/name in the Order Number field, the supplement number in the Suppl field, the agreement type in the Order Type field, and the origin of the agreement in the Origin field. The supplier assigned to the agreement is shown in the Supplier field.

The agreement line item number is displayed in the Pos field, and the sub line item number in the Sub field. The Ident Code field shows the ident code of the ident placed on this line item.

The number of the associated requisition line item is shown in the RLI Pos field, with the sub line item number in the RLI Sub field.

The Ident Short Description field at the bottom displays the ident short description.