Material Receiving - Intergraph Smart Materials - Version 2020 (10.0) - Help - Hexagon PPM

Intergraph Smart Materials Classic Help (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Help
Smart Materials/Smart Reference Data Version
2020 (10.0)

Material can be received into a site warehouse using different methods in Smart Materials. These methods are listed below.

  • Direct receiving

  • Receiving by PO

  • Receiving by Traffic

  • Receiving by Release Note

  • Receiving by Packages

Assign a receiving status to project default ZC_STATUS. This status will be set when creating a new material receiving report (MRR). The MRR number will be generated automatically based on the pre-defined MRR rule assigned to the user. If no MRR rule was assigned, the MRR rule marked as the default will be used. The revision of a new MRR number is always 0 (zero) and will be increased by 1 automatically when an MRR revision is made.

Material can only be received in a corporate warehouse in the project owning the warehouse.