The following table shows a list of acronyms and their associated meaning in this documentation.

Acronym

Meaning

Module

API

Application Programming Interface

ATA

Actual Time of Arrival

ATD

Actual Time of Departure

AWB

Air Way Bill

Traffic

BO

Blanket Order

BOL

Bill of Lading

Traffic

BOM

Bill of Materials

BOR

Blanket Order Release

CC

Commodity Code

CE

Commercial Evaluation

CEC

Commercial Evaluation Checklist

CIP

Customer Installed Procedure

CMS

Component Management System

CO

Change Order

COR

Change Order Request

CWH

Corporate Warehouse

CWS

Core Workflow Screen

General

EML

Equipment and Material List

EPC

Engineering, Procurement, and Construction

E&PI

Engineering and Procurement Integration

ER

Engineering Requisition

ERP

Enterprise Resource Planning

ETA

Estimated Time of Arrival

ETD

Estimated Time of Departure

FIM

Free Issue Warehouse

FLC

Flat Loading Configuration

BOM

FR

Forecast Run

Site

FWD

Field Work Directive

HVAC

Heating, Ventilation and Air Conditioning

IFC

Issue for Construction

BOM

IRC

Inspection Release Certificate

P.70.72

ISH

Item Shipment

ITT

Invitation To Tender

MA

Master Agreement

MCS

Material Certificate Summary

P.70.72

MIR

Material Issue Report

Site

MLCL

Material Life Cycle Library

MLD

Missed, Lost or Damaged

Site

MMT

Material Movement Ticket

P.70.72

MOC

Means of Conveyance

Traffic

MOT

Method of Transportation

MP

Manual Purchase Order

MR

Material Receipt

MRI

Material Reallocate Issue

MRR

Material Receiving Report

Site

MSCM

Material Supply Chain Management

MTO

Material Take-Off

Requisitions

MTR

Material Transfer Report

Site

NCR

Non Conformity Report, Non Conformance Report

P.70.72

NIB

Notice of Intent to Bid

NLS

National Language Support

General

NOC

Notice of Commitment

NPS

Nominal Pipe Size

NTC

Notice To Comply

NTP

Notice to Proceed

OC

Other Costs

OII

Open Ident Interface

Smart Reference Data

OMI

Open Material Interface

O/O

Owner/Operator

OPI

Open Procurement Interface

ORI

Open Requisition Interface

OSCI

Open Supplier and Company Interface

OSD

Over, Short, and Damaged

MSCM, Site

OWL

Outstanding Work List

P.70.72

PCD

Piping Commodity Data

PCO

Potential Change Order

Subcontractor Management

PDL

Physical Data Library

PICS

Physical Inventory Count Sheet

Site

PLL

Process Line List

PMC

Piping Material Class

PO

Purchase Order

PPL

Preliminary Packing List

P.70.74

QA/QC

Quality Assurance/Quality Control

QTY

Quantity

RFA

Ready for Approval

RFI

Request for Information

RFQ

Request for Quotation

P.30

RN

Release Note

ROS

Required on Site

Requisitions

RR

Reservation Run

Site

RTP

Release to Procurement

Requisitions

SC

Subcontract

Subcontractor Management

SCO

Subcontract Change Order

Subcontractor Management

SFI

Shop/Field Indicator

BOM

SMS

Subcontract Management System

Subcontractor Management

SOT

Standard with Tag (Item Type)

SOW

Scope of Work (can also be Statement of Work)

MSCM/Subcontractor Management

SRD

Smart Reference Data

SWT

Standard with Tag (Item Type)

TAB

Tag Attribute Based

TE

Technical Evaluation

TEC

Technical Evaluation Checklist

TOM

Tag without Milestone (Item Type)

TSQ

Transfer Site Quantity

BOM

TWM

Tag with Milestone (Item Type)

UOM

Unit of Measure

VDR

Vendor Data Requirement

WBS

Work Breakdown Structure

WT

Wall Thickness