Schedule a Job - EcoSys - 1.1 - Help - Hexagon PPM

EcoSys Connect Help

Language
English
Product
EcoSys
Search by Category
Help
EcoSys Version
1.1

EcoSys Connect provides flexibility to schedule your job based on time, date, week, and month or as per your requirement. Schedule feature has basic and advanced options to schedule your job.

To schedule a job,

  1. Click the Schedule tab.

  2. Schedule your job using any of the options below:

    • Select the start and end dates for the job from Schedule Start Date and Schedule End Date fields.

    • Select the required month in which you want the job to be scheduled. Select Every Month, if you want the job to run every month.

    • Select the required date on which you want the job to be scheduled. Select Every Day, if you want the job to run every day.

    • Select the week, if you want the job to run on a particular week day of the week.

  3. Click Advanced. This option lets you schedule your job on a particular day, month, and on a specific time period. The following options are available in Advanced scheduling.

    • Days(s) from the end of the month

    • Last weekday of the month

    • Specific day of specific week

    • Nearest weekday to specific day