Check Material Quantities - Intergraph Smart Materials - Version 2020 (10.0) - Training - Hexagon

Intergraph Smart Materials Classic Lab Tutorials (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Training
Smart Materials/Smart Reference Data Version
2020 (10.0)
  1. Open the R.30.01 Maintain Requisitions screen from the E&PI (Req) > R.30 Requisitions menu branch.

  2. Click the Run Query button to display the existing requisitions.

  3. Select the PIPING-FO FITTINGS requisition, and double-click in the Engineering Requisition field.

    Window 2 opens where the requisition line items are displayed.

  4. Use the scrollbar under the requisition line items to scroll to the right until the Released Quantity fields are displayed.

    You can use the in the upper right corner to enlarge the screen.

  5. Check the released quantity of all line items; this quantity was set by the MTO job equal to the New List Quantity value by default.

  6. Save the changes using the Save button.

  7. Check the Released Quantity values of the other requisitions in the same way.

  8. Close the screen by selecting File > Close All or Close from the main menu.