ZP_ALL_OC - Intergraph Smart Materials - Version 2020 (10.0) - Administration & Configuration - Hexagon PPM

Intergraph Smart Materials Classic Administration (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
2020 (10.0)

This project default specifies the other costs to be included for the best split.

With this project default, you can control how the total of best split is calculated on P.30.22 Commercial Evaluation, Awarding tab.

The value shown in the Third Overall Total (= Total Best Split) field is determined by CIP m_pck_quote_custom.get_third_total_value.

If you set ZP_ALL_OC to Y (default), the other costs at the quote summary level of all selected bidders are included in the total of best split.

If this project default is set to N, only the other costs of the bidder who has the lowest other costs at the quote summary level are included in the total, regardless of whether he has been selected or not.

Other costs listed on bids that were marked as rejected are not considered.

Nevertheless, the value of the Total Best Split field is determined by that CIP. The description above is only valid for the standard installation of that CIP. It is up to you to modify it in any way you want.

  • Module(s) affected by this setting: P3022

  • Default value: Y

  • List of Values: N/Y