ZB_LJ_ID - Intergraph Smart Materials - Version 2020 (10.0) - Administration & Configuration - Hexagon PPM

Intergraph Smart Materials Classic Administration (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
2020 (10.0)

This project default is used only on B.20.01 and is necessary if the value of project default ZB_ONLVER is set to Y.

The project default points to a defined verification job from B.20.01.35 or B.20.01.41. This job must be a master. If the assigned job is gone, an error message occurs at execution time.

The functionality is almost the same as on B.20.01.35 or B.20.01.41. In the first step, the assigned job is copied to a new job. The second step is to start the new job.

So with this functionality a specific and often used verification job can be assigned to a button.

  • Module(s) affected by this setting: B2001, B2003

  • Default value: ./.

  • List of Values: B200135 Verification and Status