ZI_OMI_DCA - Intergraph Smart Materials - Version 2020 (10.0) - Administration & Configuration - Hexagon PPM

Intergraph Smart Materials Classic Administration (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
2020 (10.0)

This project default specifies how OMI should handle old unacknowledged design change control log entries it may encounter during load of a new highest issue status position data set into a BOM node. Possible values are: ERR, ACK, and DEL. The default is ERR.

These setting values have the following meaning:

ERR: Raise an error and reject the BOM node. This implies that a new issue status cannot be loaded unless all design change log entries have been explicitly acknowledged on C.50.01.

ACK: Automatically acknowledge the design change for the old highest issue status and keep the log entry

DEL: Ignore the unacknowledged design change for the old highest issue status and delete the log entry

Setting this option to ACK also implies that you will not be able to delete the OMI job on B.40.01 any longer, because this job will then become part of the design change history; the system needs to keep it along with the design change log entry itself for future reference.

  • Module(s) affected by this setting: B4001

  • Default value: ERR

  • List of Values: ACK, DEL, ERR