Report Management Data - PDS - Help

Plant Design System (PDS) Report Manager (PD_Report)

PPMProductFamily
3D Design and Visualization
PPMProduct
PDS
PPMCategory
Help

Special consideration must be made at the end of a pipeline to check if nozzles exist and generate mating implied material.

If commodity codes and material descriptions are not reported and chain wheels are present, the reported quantity of implied components will not be correct.

When reporting on pipe length, for sorting to be effective, you must sort all the items reported in pipes with length as the last sort criteria. If length is sorted first, no summation or partial summation may occur.

MTO Labels never wrap around; they are always based on field length. MTO Labels with multiple lines translate into one line.

MTO Format File Example

The following illustrates an example of an MTO format file.

For more information on format files, see Sample Format Files and Output.

report_type=689 ! Piping Components MTO Report

1,1,1,-13,1,1,'Date/Time :'

1,1,14,-23,1,5

1,1,50,-40,1,1,'PDS MTO REPORT'

1,1,120,-6,1,1,'Page: '

1,1,127,-3,2,4

2,3,10,-40,1,1,'Corporate Headquarters'

2,4,10,-40,1,1,'Intergraph Corporation'

2,5,10,-40,1,1,'Huntsville, Alabama 35894-0001'

2,6,10,-40,1,1,'(205)730-2000'

2,3,90,-20,1,2,B**Q5

2,3,110,-20,1,2,B**Q9

2,4,90,-20,1,2,B**Q6

2,5,90,-20,1,2,B**Q7

2,6,90,-20,1,2,B**Q8

1,8,1,-25,1,-1,'Commodity Code'

1,8,27,-16,1,-1,'Qty/Length'

1,8,45,-10,1,-1,'1st Size'

1,8,57,-10,1,-1,'2nd Size'

1,8,69,-63,1,-1,'Material Description'

9

4,10,55,-50,'LINE NUMBER: [A30]',-2,BI2G1,45,2

7

4,10,55,-50,'LINE NUMBER: [A30]',-2,BB2G1,45,2

7

4,10,55,-50,'LINE NUMBER: [A30]',-2,B*I2G1,45,2

7

4,10,55,-50,'LINE NUMBER: [A30]',-2,BT1G1,45,2

7

4,10,55,-50,'LINE NUMBER: [A30]',-2,BX1G1,45,2

7

4,10,55,-50,'LINE NUMBER: [A30]',-2,B**K2G1,45,2

7

4,10,55,-50,'LINE NUMBER: [A30]',-2,B*S2G1,45,2

8

4,12,1,-25,1,2,BG8S2,45,2

4,12,27,-16,2,2,BS,45,2

4,12,45,-10,1,2,BN49S3,45,2

4,12,57,-10,1,2,BN-49S4,45,2

4,12,69,63,1,2,BM1S5,45,2

7

4,12,1,-25,1,2,BA12S2,45,2

4,12,27,-16,1,2,BA22,45,2

4,12,45,-10,1,2,BA7S3,45,2

4,12,69,63,1,2,BF1S4,45,2

7

4,12,1,-25,1,2,B*G2S2,45,2

4,12,27,-16,2,2,B*O,45,2

4,12,45,-10,1,2,B*L55S3,45,2

4,12,57,-10,1,2,B*L-55S4,45,2

4,12,69,63,1,2,B*K1S5,45,2

7

4,12,1,-25,1,2,BT13S2,45,2

4,12,27,-16,2,2,BV,45,2

4,12,45,-10,1,2,BT2S3,45,2

4,12,57,-10,1,2,BT23,45,2

4,12,69,63,1,2,BT21S4,45,2

7

4,12,1,-25,1,2,BX12S2,45,2

4,12,27,-16,2,2,BZ,45,2

4,12,45,-10,1,2,BX4S3,45,2

4,12,57,-10,1,2,BX5S4,45,2

4,12,69,63,1,2,BX20S5,45,2

7

4,12,1,-25,1,2,B**J7S2,45,2

4,12,27,-16,1,2,B**O,45,2

4,12,69,63,1,2,B**M1S3,45,2

7

4,12,1,-25,1,2,B*P12S2,45,2

4,12,27,-16,2,2,B*R,45,2

4,12,45,-10,1,2,B*S11S3,45,2

4,12,69,63,1,2,B*U1S4,45,2

10

5

1,3,1,-13,1,1,'Date/Time :'

1,3,14,-23,1,5

1,3,50,-40,1,1,'PDS MTO REPORT'

1,3,120,-6,1,1,'Page: '

1,3,127,-3,2,4

1,11,1,-34,1,-1,'GRAND TOTALS'

1,13,1,-15,1,-1,'Components'

1,13,20,-15,1,-1,'Pipes'

1,13,40,-15,1,-1,'Instruments'

1,13,60,-15,1,-1,'Gaskets'

1,13,80,-15,1,-1,'Bolts'

1,13,100,-15,1,-1,'Pipe Supports'

1,14,1,-15,2,2,BST

1,14,20,-15,2,2,BRT

1,14,40,-15,2,2,B*OT

1,14,60,-15,2,2,BVT

1,14,80,-15,2,2,BZT

1,14,100,-15,2,2,B*RT