Duct Banks at Pull Pits - Intergraph Smart 3D - Help

Intergraph Smart 3D Electrical

PPMProduct
Intergraph Smart 3D
PPMCategory_custom
Help
SPFVersion_custom
2019 (10.0)
Version_S3D
12.1(2019)

To enable cable routing between the conduits, use pull pits to join conduits between duct banks. Begin by placing the pull pit, found in Equipment, and then routing the duct banks up to the pull pit. Within the pull pit, connect conduit end features belonging to different duct banks with zero spec cableway (CWS-0). The zero spec cableway ensures continuity for cables to pass through. In addition, using the Auto Connect command to create these connecting cableways simplifies the process.

The following illustration is an example of a pull pit; this is just one option.

See Also

Auto Connect Cableways
Extend existing cablewayExtend existing cableway, Extend existing cablewayExtend existing cableway
Place equipment from the catalog
Route duct bank