Required - j5 - 28.0 - Administration & Configuration - Hexagon PPM

j5 Operator Rounds Help

Language
English (United States)
Product
j5
Search by Category
Administration & Configuration
j5 Version
2019

Determines if the associated task is required for the operator round’s completion. Required task labels are dark orange and are marked with an asterisk (*).

The required cell for a task can be set to Yes, left blank or an expression can be used.

When an expression is used the task is required if the conditions of the expression are met. For example, if the following expression is used in the cell:

ControlMode = "DCS"

Then the task mill be marked as required when the control mode selected on the form is DCS.