Basic risk assessment - j5 - 30 - Help - Hexagon

j5 Control of Work Help

Language
English
Product
j5
Search by Category
Help
j5 Version
30

The basic risk assessment allows you to select the hazards and their appropriate controls for the planned work, select the appropriate PPE items considering the work and potential hazards, and declare that the hazards and controls have been identified. There is no risk scoring at this level.

Basic risk assessment

  1. Select the Basic level.

  2. Select hazards and controls

  3. Select PPE items

  4. When all the relevant hazards, controls, and PPE items have been selected, select the ALARP (or your local equivalent) declaration checkbox.