Using Line Run Placement - Intergraph Smart P&ID - Help - Intergraph

SmartPlant P&ID Rule Manager Help

Language
English
Product
Intergraph Smart P&ID
Subproduct
Rule Manager
Search by Category
Help
Smart P&ID Version
7.1 (2014 R1)
Smart Engineering Manager Version
7.2 (2014 R2)

Line Run placement supports placement of one item, the source, relative to an existing item, the target. The method assumes that the source item is a line run and the target item is a symbol. Line run placement uses connect point information in the target item to calculate the placement configurations. When you use this placement method, you specify the connect point type for the target item. Do not specify connect point types for the source item.

The Line Run Placement method uses this placement method to attach piping and signal lines to instruments and piping components.