Save Versions of All Drawings - Intergraph Smart P&ID - Help - Intergraph

SmartPlant P&ID Drawing Manager Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
SmartPlant Foundation / SDx Version
Smart P&ID Version
7.1 (2014 R1)
Smart Engineering Manager Version
7.2 (2014 R2)
Smart P&ID Web API Version
(none)
  1. In the Tree view, select the site, plant, or project containing the drawings you want to save versions of.

  2. Click Revisions > Incremental New Versions.

  3. Follow the steps and directions on the Schedule Task Wizard, and click Finish to schedule the operation at another time or on a regular interval.

  • When saving versions of all drawings in a Plant that has projects, new versions of the drawings belonging to those projects are created also.

  • This procedure saves new versions of only those drawings whose time stamp shows that they have changed since the last version was saved.

  • Instead of creating versions of a set of drawings, you can create a version of a single drawing. For more information, see Save a Version of a Drawing.