Navigating in Drawing Manager - Intergraph Smart P&ID - Help - Intergraph

SmartPlant P&ID Drawing Manager Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
SmartPlant Foundation / SDx Version
Smart P&ID Version
7.1 (2014 R1)
Smart Engineering Manager Version
7.2 (2014 R2)
Smart P&ID Web API Version
(none)

The main Drawing Manager interface is split into two main panes: the Tree view, where plant groups are arranged in nodes, and the List view, where lists of drawings appear. 

You can control the display in the List view in many ways: add a filter so that only drawings that match specific criteria are displayed, display all drawings that reside under the selected node in the Tree view, and specify which and in what order drawing properties appear in the List view. The following commands are needed to carry out these activities.

Open Database — Used to open a site so that you can access a plant or project and its related drawings. For more information, see Open Database Command (File Menu).

Customize Current View — Allows you to specify the drawing properties that you want to appear in the List view. For more information, see Customize Current View Command (View Menu).

Include Subnodes — Controls the depth of display in the List view. For more information, see Include Subnodes Command (View Menu).

Select All — Selects all of the drawings in the List view. For more information, see Select All Command (Edit Menu).

Filter — Allows you to filter out drawings that you do not want displayed in the List view. For more information, see Filter Command (View Menu).

Clear Filter — Used to clear any filters applied to the List view. For more information, see Clear Filter Command (View Menu).

Properties — Displays properties related to the selected plant group or drawing. For more information, see Properties Command (Edit Menu).

Exit — Used to close Drawing Manager. For more information, see Exit Command (File Menu).

You can drag-and-drop drawings from one plant group to another plant group, providing the drawings are in the same plant structure and the Allow P&ID Drawings option has been enabled in SmartPlant Engineering Manager.