Scenario 3: OPCs - Intergraph Smart P&ID - Help - Intergraph

SmartPlant P&ID Drawing Manager Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
SmartPlant Foundation / SDx Version
Smart P&ID Version
7.1 (2014 R1)
Smart Engineering Manager Version
7.2 (2014 R2)
Smart P&ID Web API Version
(none)

The following workflow demonstrates handling OPCs in a connected Workshare collaboration using projects.

1

Project 1 checks out Drawing A from the Plant.

2

Project 1 checks out Drawing B from the Plant.

3

Project 1 assigns ownership of Drawing B to Satellite 1.1.

4

Project 1 checks out Drawing C from the Plant.

5

Project 1 assigns ownership of Drawing C to Satellite 1.1.

6

Project 1 opens Drawing A, places OPC-100, sends the partner OPC-100 to Drawing B, and closes the drawing.

Drawing A becomes Drawing A'.

7

Project 1 synchronizes shared items with Satellite 1.1.

8

Satellite 1.1 synchronizes shared items.

9

Satellite 1.1 opens Drawing B, places partner OPC-100 from the drawing stockpile, and closes the drawing.

10

Project 1 synchronizes shared items with Satellite 1.1, then opens Drawing A' and verifies that "to drawing" name in the OPC label is updated with information from Drawing B.

Drawing A' becomes Drawing A''.

11

Project 2 fetches Drawing A'' and assigns subscription access to Satellite 2.1.

12

Satellite 2.1 opens drawing A'' and verifies that the OPC label is updated with information from Drawing B, then closes Drawing A''.

13

Project 1 assigns ownership of Drawing A'' to Satellite 1.1 and synchronizes shared items.

Satellite 1.1 gets latest version of Drawing A'' and synchronizes shared items.

Satellite 1.1 opens Drawing A'' and verifies that the "to drawing" name of OPC-100 is updated, then closes Drawing A''.

14

Satellite 1.1 opens Drawing B, deletes OPC-100 to the Plant stockpile, then closes the drawing.

15

Satellite 1.1 opens Drawing C, places OPC-100 from the Plant stockpile, then closes the drawing.

16

Satellite 1.1 assigns ownership of Drawing A'' to Project 1 and synchronizes shared items.

17

Project 1 gets latest version from remote and synchronizes shared items.

Drawing A'' becomes Drawing A'''.

18

Project 1 opens Drawing A''' and verifies that the graphical label in OPC-100 contains the correct information and that the data relating to OPC-100 and its partner is correct in the EDE, then closes the drawing.

19

Project 2 fetches Drawing A''' from Project 1.

Project 2 opens Drawing A''' and verifies that the graphical label in OPC-100 contains the correct information and that the data relating to OPC-100 and its partner is correct in the EDE, then closes the drawing.

Project 2 publishes and assigns subscription access for Drawing A''' to Satellite 2.1, then synchronizes shared items.

20

Satellite 2.1 gets latest version, subscribes to the updated Drawing A''', and synchronizes shared items.

Satellite 2.1 opens Drawing A''' and verifies that the graphical label in OPC-100 contains the correct information and that the data relating to OPC-100 and its partner is correct in the EDE, then closes the drawing.

In a standalone Workshare collaboration, the satellite site needs only to be given subscribe access to a drawing in order to access items (for example, OPCs) in the Plant stockpile.

See Also

Projects vs. Workshare