  1. In the Domain Explorer, under Panels By Category > Marshaling Racks, right-click 101-MR-DCS-001, and on the shortcut menu, click Actions > Connection.

  2. Ensure that in the Terminal strip list, terminal strip 101-MR-DCS-001, FT-1 is selected.

  3. Drag cable C-101-JB-DCS-001/1 from the Cables folder in the Domain Explorer to the first terminal at the left side of the terminal strip.

  4. On the Cable Connection Definition dialog box, select End 1 (JB) to select the junction box side for connection.

    All sets on cable end 1 are already connected, as indicated
    by (screw heads) in the Side column.

  5. Click the End 2 (MARSHALING) option button to select the marshaling rack side.

  6. Make sure that 1+ is selected for Start at terminal list, and the Select all cable sets check box is selected.

  7. Make sure that the connection type is 3 in a row for all sets.

  8. Click Connect.

    Observe that the tag numbers have been propagated up to the left side of the terminals.

    Open the Point-to-Point Diagram again for the first wire named
    C-101-FT-100. Notice the progress.

  9. Click to close the Connection window.