Concurrent Engineering with Integration - SmartPlant Foundation - IM Update 46 - Help - Hexagon

SmartPlant Foundation Help

Language
English
Product
SmartPlant Foundation
Search by Category
Help
SmartPlant Foundation / SDx Version
10
SmartPlant Markup Plus Version
10.0 (2019)
Smart Review Version
2020 (15.0)

For tools that support it, Intercompany Collaboration 2 (ICC2) allows you to publish documents at the plant or project level. When you publish from a tool, the document will be published to the configuration in SmartPlant Foundation that corresponds to the location of the document in the tool. For example, if you publish a document from the plant level in the tool, the published document will be placed at the plant level in the data warehouse in SmartPlant Foundation. If you publish from a project called Project 1A in the tool, the published document will be placed in Project 1A in SmartPlant Foundation.

All the necessary claiming or unclaiming that is required is managed by the software during the publish operation. For example, if an object being published to a project already exists at the plant level in SmartPlant Foundation, claim instructions are created during publish to allow that object to be claimed into the project. To merge objects published to the project-level up to the plant level, merge the object to the as-built plant in the authoring environment and republish it there.