-
The CLOSED requisition status is set when:
-
The requisition is created.
-
The requisition is approved.
-
The requisition is released to Procurement.
-
-
How can you specify that MTO jobs automatically round up the calculated quantity to cover contingencies?
-
What do you specify with BOM sets?
-
The scope of the BOM to be included in the MTO job.
-
The kind of material to be placed on a requisition.
-
The time interval when the MTO job is executed.
-
-
The requisitions to be created by an MTO job are predefined by
-
Requisition nodes
-
Requisition templates
-
Requisition number rules.
-
-
How can you ensure that an MTO job ‘finds’ all material within the defined scope of BOM?